ONOFF
划词翻译
导航
建议反馈
词典App

cascade development中文是什么意思

  • 级联显色

"查查词典"手机版

千万人都在用的超大词汇词典翻译APP

  • 例句与用法
  • All the problems mentioned above , restrict the cascade development of huanghe river ' s hydroelectric
    所有这些问题的存在,严重制约了黄河上游水电梯级滚动开发。
  • Article 16 . the state shall encourage the development and utilization of hydraulic power potentials . on rivers rich with hydraulic power potentials , multipurpose cascade development shall be effected in a planned way
    第十六条国家鼓励开发利用水能资源。在水能丰富的河流,应当有计划在进行多目标梯级开发。
  • Though the study of basic theory and solution of cascade development gradation , the author brought two projects of the gradation of cascade hydroelectric development of huanghe upstream
    通过三大问题的研究,为黄河上游水电实现梯级滚动开发奠定了重要的理论基础,并对西部大开发战略的实施具有重要的参考价值。
  • The hydropower cascade development is a complex work . it will involve many aspects of a compound ecosystem . but the quantitative study for basin environment effect is scarce and its theory and method system is still not integrated
    流域水电梯级开发是一项复杂而系统的工作,涉及到复合生态系统的多个方面,对流域开发的环境影响研究也一直都是理论界的一个研究热点。
  • Under the premise of actuality of analysis of huanghe river ' s hydroelectric development , the author brought forward a strategically aim based on the cascade development system , found key technical issues of the development at present and in the near future
    本文从分析黄河上游水电能源开发现状入手,提出以滚动开发体制为基础的战略目标,找出目前和近期开发中存在的主要几个关键技术问题。
  • This paper discusses the characteristics of hydroelectric cascade development of river basin , and the analysis of main risks , and puts forwards the objectives , procedures and detailed plans of risk analysis and management , and its insurance characteristics and relevant points for attention while insuring
    摘要通过对流域梯级水电开发的特点及主要风险的分析,提出了流域梯级水电开发的风险管理目标、程序和具体方案,以及在保险方面的特性和投保时的相关注意事项。
  • Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream , total installed capacity 252mw , total reservoir capacity 430 million - m3 , maximum dam height 57m , length of dam axis 439 . 5m , total static investment rmb 623 . 48 million ( 1998 price )
    高坝洲水利枢纽是清江流域三级水电站的最下游一级水电站,电站总装机容量252mw ,总库容4 . 3亿m ~ 3 ,最大坝高57m ,坝轴线长439 . 5m ,静态总投资( 1988年价格) 62348万元。
  • From two aspects of structure ( integrity ) and function ( sensitivity ) of compound ecosystem , the estimation indexes system and differentiation model on environment effect of basin hydropower cascade development is attempted to set up . in chapter five we debate the environment cost factors , cost calculation methods and the quantitative changing relation of cost and environment quality . the analysis will in some degree make up the limitation of environment assessment
    文中尝试从复合生态的结构(整体性)和功能(敏感性)两个方面,分析并建立了反应流域水电梯级开发的复合生态系统环境效应的测度指标体系,同时提出并运用新的环境指标及相关环境成本辨识模型进行复合生态系统环境影响成本分析,从体系框架上较传统的指标体系建立有所不同。
  • 其他语种释义
  • 推荐英语阅读
cascade development的中文翻译,cascade development是什么意思,怎么用汉语翻译cascade development,cascade development的中文意思,cascade development的中文cascade development in Chinesecascade development的中文cascade development怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。
Last modified time:Sun, 17 Aug 2025 00:29:56 GMT

说出您的建议或使用心得